山東電纜橋架安裝規范解析

  電纜橋架的安裝需遵循嚴格規范,以保障其承載電纜的性和穩定性,同時為后續依據。安裝規范貫穿于準備、施工及驗收的全過程,每個環節都有明確要求。

  The installation of cable trays must follow strict specifications to ensure the safety and stability of the cables they carry, and to serve as a basis for future reference. Installation standards run through the entire process of preparation, construction, and acceptance, with clear requirements for each link.

  安裝前的準備工作是規范執行的基礎。需根據設計圖紙核對現場環境,確認橋架的敷設路徑、安裝位置及標高是否與圖紙一致,同時檢查路徑上是否存在障礙物,如管道、梁柱等,若有沖突需提前協調調整。其次,對進場的電纜橋架及附件(如支架、連接件、固定件等)進行外觀檢查,確保無變形、損壞、銹蝕等情況,材質和規格符合設計要求,必要時可核對產品相關合格證明文件。此外,準備好所需的安裝工具,如電鉆、扳手、水平儀等,確保工具完好且符合使用標準。

  The preparation work before installation is the foundation for standardized execution. Firstly, it is necessary to verify the on-site environment according to the design drawings, confirm whether the laying path, installation position, and elevation of the bridge are consistent with the drawings, and check whether there are obstacles on the path, such as pipelines, beams, and columns. If there are conflicts, they need to be coordinated and adjusted in advance. Secondly, conduct a visual inspection of the incoming cable trays and accessories (such as brackets, connectors, fixings, etc.) to ensure that there is no deformation, damage, rust, etc., and that the materials and specifications meet the design requirements. If necessary, check the relevant product qualification certificates. In addition, prepare the necessary installation tools such as drills, wrenches, level gauges, etc., to ensure that the tools are in good condition and meet safety usage standards.

20221114120604238.jpg

  支架安裝是橋架固定的關鍵環節,需嚴格遵循規范。支架的間距應根據橋架規格、承載重量及安裝環境確定,通常在 1.5 米 3 米之間,間距過大可能導致橋架下垂變形。支架的固定方式需根據墻體、樓板等基層材質選擇,如在混凝土基層上可采用膨脹螺栓固定,在鋼結構上可采用焊接或螺栓連接,確保固定牢固可靠,避免松動。支架安裝時需保持水平或垂直,同一方向的支架應在同一直線上,偏差不超過規定范圍,以保證橋架安裝后的平整度。

  The installation of brackets is a crucial step in fixing cable trays and must strictly comply with regulations. The spacing between brackets should be determined according to the specifications, load-bearing capacity, and installation environment of the bridge, usually between 1.5 meters and 3 meters. Excessive spacing may cause the bridge to sag and deform. The fixing method of the bracket needs to be selected according to the material of the base layer such as the wall and floor. For example, expansion bolts can be used to fix it on the concrete base layer, and welding or bolt connections can be used on the steel structure to ensure firm and reliable fixation and avoid loosening. When installing the bracket, it should be kept horizontal or vertical, and brackets in the same direction should be on the same straight line, with a deviation not exceeding the specified range, to ensure the flatness of the bridge after installation.

  橋架的組裝與連接需符合規范要求。橋架之間的連接應采用專用連接件,連接時需緊密牢固,縫隙處可根據需要設置密封墊,防止灰塵、水汽進入。對于直線段橋架,其長度超過一定范圍(通常為 30 米)時,應設置伸縮節,以應對溫度變化引起的熱脹冷縮,避免橋架變形。在轉彎、分支處,需使用相應的彎通、三通等配件,確保橋架走向平滑過渡,轉彎半徑應滿足電纜彎曲半徑的要求,避免電纜因彎曲過度受損。

  The assembly and connection of the bridge frame must comply with the specifications. The connection between cable trays should use specialized connectors, which should be tightly and firmly connected. Sealing gaskets can be installed at the gaps as needed to prevent dust and moisture from entering. For straight cable trays, when their length exceeds a certain range (usually 30 meters), expansion joints should be installed to cope with thermal expansion and contraction caused by temperature changes and avoid deformation of the tray. At bends and branches, corresponding fittings such as bends and tees should be used to ensure a smooth transition in the direction of the bridge. The turning radius should meet the requirements of the cable bending radius to avoid damage to the cable due to excessive bending.

  橋架的敷設與固定也有明確規范。敷設時,橋架應與地面保持平行或垂直,排列整齊,層次分明,不同電壓、不同用途的電纜應分槽敷設,若需共槽敷設,需采取隔離措施。橋架與支架之間的固定應牢固,每個橋架少應有兩個固定點,防止橋架在受力時滑動。在穿越防火墻、樓板等部位時,需按規范要求進行防火封堵,使用防火材料填充縫隙,防止火災蔓延。

  There are also clear specifications for the laying and fixing of cable trays. When laying, the cable tray should be kept parallel or perpendicular to the ground, arranged neatly and with clear layers. Cables of different voltages and purposes should be laid in separate slots. If they need to be laid in the same slot, isolation measures should be taken. The fixation between the bridge and the bracket should be firm, and each bridge should have at least two fixing points to prevent the bridge from sliding under stress. When passing through firewalls, floor slabs, and other areas, fireproof sealing should be carried out according to regulatory requirements, and fireproof materials should be used to fill gaps to prevent the spread of fire.

  安裝后的檢查驗收是規范執行的收尾環節。檢查橋架的整體平整度,用水平儀檢測直線段是否水平,垂直度是否符合要求,偏差應控制在允許范圍內。其次檢查連接部位是否牢固,支架是否穩定,無松動、晃動現象。然后核對橋架的標高、位置及走向是否與設計一致,配件安裝是否齊全。,清理安裝過程中產生的雜物,確保橋架內部干凈整潔,為后續電纜敷設創造良好條件。

  The inspection and acceptance after installation is the final stage of standardized execution. Firstly, check the overall flatness of the bridge frame, use a level to check whether the straight sections are horizontal and whether the verticality meets the requirements, and the deviation should be controlled within the allowable range. Next, check if the connection parts are secure, if the bracket is stable, and if there is no looseness or shaking. Then check whether the elevation, position, and direction of the bridge are consistent with the design, and whether the installation of accessories is complete. Finally, clean up any debris generated during the installation process to ensure that the interior of the cable tray is clean and tidy, creating favorable conditions for subsequent cable laying.

  本文由山東電纜橋架友情奉獻.更多有關的知識請點擊  http://www.h3022.cn   真誠的態度.為您提供為的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://www.h3022.cn Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.山東電纜橋架

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 河北凯普威医疗器材有限公司,高档轮椅系列,推车系列,座厕椅系列,协步椅系列,拐扙系列,卫浴系列 | 电机保护器-电动机综合保护器-上海硕吉电器有限公司 | 翻斗式矿车|固定式矿车|曲轨侧卸式矿车|梭式矿车|矿车配件-山东卓力矿车生产厂家 | 电子元器件呆滞料_元器件临期库存清仓尾料_尾料优选现货采购处理交易商城 | 水性绝缘漆_凡立水_绝缘漆树脂_环保绝缘漆-深圳维特利环保材料有限公司 | 3dmax渲染-效果图渲染-影视动画渲染-北京快渲科技有限公司 | 北京成考网-北京成人高考网| 一体化污水处理设备_生活污水处理设备_全自动加药装置厂家-明基环保 | 液压中心架,数控中心架,自定心中心架-烟台恒阳机电设计有限公司 行星搅拌机,双行星搅拌机,动力混合机,无锡米克斯行星搅拌机生产厂家 | 急救箱-应急箱-急救包厂家-北京红立方医疗设备有限公司 | 不干胶标签-不干胶贴纸-不干胶标签定制-不干胶标签印刷厂-弗雷曼纸业(苏州)有限公司 | 诸城网站建设-网络推广-网站优化-阿里巴巴托管-诸城恒泰互联 | 合肥办公室装修 - 合肥工装公司 - 天思装饰 | 依维柯自动挡房车,自行式国产改装房车,小型房车价格,中国十大房车品牌_南京拓锐斯特房车 - 南京拓锐斯特房车 | 辐射仪|辐射检测仪|辐射巡测仪|个人剂量报警仪|表面污染检测仪|辐射报警仪|辐射防护网 | 带式压滤机_污泥压滤机_污泥脱水机_带式过滤机_带式压滤机厂家-河南恒磊环保设备有限公司 | 济南画室培训-美术高考培训-山东艺霖艺术培训画室 | PCB接线端子_栅板式端子_线路板连接器_端子排生产厂家-置恒电气 喷码机,激光喷码打码机,鸡蛋打码机,手持打码机,自动喷码机,一物一码防伪溯源-恒欣瑞达有限公司 假肢-假肢价格-假肢厂家-河南假肢-郑州市力康假肢矫形器有限公司 | 阻燃剂-氢氧化镁-氢氧化铝-沥青阻燃剂-合肥皖燃新材料 | 酸度计_PH计_特斯拉计-西安云仪 纯水电导率测定仪-万用气体检测仪-低钠测定仪-米沃奇科技(北京)有限公司www.milwaukeeinst.cn | 污水/卧式/潜水/钻井/矿用/大型/小型/泥浆泵,价格,参数,型号,厂家 - 安平县鼎千泵业制造厂 | 礼仪庆典公司,礼仪策划公司,庆典公司,演出公司,演艺公司,年会酒会,生日寿宴,动工仪式,开工仪式,奠基典礼,商务会议,竣工落成,乔迁揭牌,签约启动-东莞市开门红文化传媒有限公司 | 河南档案架,档案密集架,手动密集架,河南密集架批发/报价 | 广州展台特装搭建商|特装展位设计搭建|展会特装搭建|特装展台制作设计|展览特装公司 | 深圳办公室装修-写字楼装修设计-深圳标榜装饰公司 | 昆明化妆培训-纹绣美甲-美容美牙培训-昆明博澜培训学校 | 中天寰创-内蒙古钢结构厂家|门式刚架|钢结构桁架|钢结构框架|包头钢结构煤棚 | 翰香原枣子坊加盟费多少钱-正宗枣核糕配方培训利润高飘香 | 贵州科比特-防雷公司厂家提供贵州防雷工程,防雷检测,防雷接地,防雷设备价格,防雷产品报价服务-贵州防雷检测公司 | 体感VRAR全息沉浸式3D投影多媒体展厅展会游戏互动-万展互动 | 不锈钢搅拌罐_高速搅拌罐厂家-无锡市凡格德化工装备科技有限公司 | 除尘布袋_液体过滤袋_针刺毡滤料-杭州辉龙过滤技术有限公司 | 碳钢法兰厂家,非标法兰,定制异型,法兰生产厂家-河北九瑞管道 | 密集架-密集柜厂家-智能档案密集架-自动选层柜订做-河北风顺金属制品有限公司 | 山东PE给水管厂家,山东双壁波纹管,山东钢带增强波纹管,山东PE穿线管,山东PE农田灌溉管,山东MPP电力保护套管-山东德诺塑业有限公司 | 光栅尺_Magnescale探规_磁栅尺_笔式位移传感器_苏州德美达 | 1000帧高速摄像机|工业高速相机厂家|科天健光电技术 | 影视模板素材_原创专业影视实拍视频素材-8k像素素材网 | 美国PARKER齿轮泵,美国PARKER柱塞泵,美国PARKER叶片泵,美国PARKER电磁阀,美国PARKER比例阀-上海维特锐实业发展有限公司二部 | 锡膏喷印机-全自动涂覆机厂家-全自动点胶机-视觉点胶机-深圳市博明智控科技有限公司 | 北京律师事务所_房屋拆迁律师_24小时免费法律咨询_云合专业律师网 |