濟南電纜橋架安裝全流程注意事項解析

  電纜橋架作為電力與通信線路的重要載體,其安裝質量直接影響系統運行與使用壽命。從施工準備到驗收交付,每個環節均需嚴格遵循技術規范,確保橋架系統穩固可靠。

  As an important carrier of power and communication lines, the installation quality of cable trays directly affects the safety and service life of the system operation. From construction preparation to acceptance and delivery, every step must strictly follow technical specifications to ensure the stability and reliability of the bridge system.

  安裝前需對施工環境進行勘查。確認建筑結構承重能力,混凝土強度需達到C20以上方可進行膨脹螺栓固定。對于鋼結構廠房,需檢測橫梁撓度,確保橋架荷載不超過設計值的70%。環境溫濕度同樣關鍵,低溫環境下金屬橋架收縮率可達0.02%/℃,需預留熱脹冷縮補償量;潮濕區域則需選用鍍鋅厚度≥65μm的橋架,防止銹蝕。

  A comprehensive survey of the construction environment is required before installation. The key is to confirm the load-bearing capacity of the building structure, and the concrete strength must reach C20 or above before expansion bolt fixation can be carried out. For steel structure factories, it is necessary to detect the deflection of the crossbeam to ensure that the bridge load does not exceed 70% of the design value. The temperature and humidity of the environment are equally critical. The shrinkage rate of metal cable trays can reach 0.02%/℃ in low-temperature environments, and compensation for thermal expansion and contraction needs to be reserved; In damp areas, cable trays with a galvanized thickness of ≥ 65 μ m should be selected to prevent rusting.

  工具與材料驗收是質量控制的首道關卡。電動扳手扭矩需校準±5%,確保M10螺栓緊固力矩達標。橋架本體檢測需涵蓋外觀、尺寸與鍍層厚度,使用涂層測厚儀隨機抽檢,鍍鋅層厚度不足60μm或噴塑層附著力不達1級標準的產品禁止使用??缃訉Ь€需采用4mm2銅編織帶,截面積不足將影響接地連續性。

  The acceptance of tools and materials is the first hurdle in quality control. The torque of the electric wrench needs to be calibrated to ± 5% to ensure that the tightening torque of the M10 bolt meets the standard. The inspection of the bridge body should cover appearance, size, and coating thickness. A coating thickness gauge should be used for random sampling. Products with a galvanized layer thickness of less than 60 μ m or a spray coating adhesion that does not meet Level 1 standards are prohibited from use. The jumper wire needs to use 4mm 2 copper braided tape, and insufficient cross-sectional area will affect grounding continuity.

  定位劃線階段需建立三維坐標系。水平誤差每米不得超過2mm,全長偏差控制在10mm以內,使用激光投線儀配合墨斗彈線。轉角處需采用45°拼接工藝,避免直角彎頭造成的線路磨損。對于多層橋架,垂直間距需預留200mm以上,便于散熱與維護,底部距地面高度不宜低于2.5米,防止機械損傷。

  The positioning and marking stage requires the establishment of a three-dimensional coordinate system. The horizontal error shall not exceed 2mm per meter, and the overall deviation shall be controlled within 10mm. A laser projector shall be used in conjunction with an ink fountain to mark the line. 45 ° splicing technology should be used at the corner to avoid line wear caused by right angle bends. For multi-layer cable trays, a vertical spacing of at least 200mm should be reserved for heat dissipation and maintenance. The bottom should not be less than 2.5 meters above the ground to prevent mechanical damage.

20221114120958540.jpg

  支吊架安裝是確保橋架穩定性的核心環節。膨脹螺栓埋深需達到80mm以上,使用扭矩扳手分兩次緊固,達到設計值70%,二次復緊間隔24小時。吊架間距需根據橋架規格調整,200mm寬橋架間距不得超過1.5米,超過400mm寬需增設縱向抗震支吊架。對于非直線段,每3米需增設固定支架,防止變形。

  The installation of supports and hangers is the core link to ensure the stability of the bridge. The burial depth of the expansion bolt should be at least 80mm, and it should be tightened twice with a torque wrench. The first tightening should reach 70% of the design value, and the second tightening should be spaced 24 hours apart. The spacing between hangers should be adjusted according to the specifications of the bridge frame. The spacing between 200mm wide bridge frames should not exceed 1.5 meters, and longitudinal seismic support hangers should be added if the width exceeds 400mm. For non-linear sections, fixed brackets should be added every 3 meters to prevent deformation.

  橋架組裝需遵循“先下后上、先內后外”原則。連接板螺栓緊固順序需對稱交叉進行,避免單邊受力導致密封不嚴。蓋板安裝前需清理內部雜物,使用吸塵器配合粘毛滾筒,防止金屬碎屑損傷電纜絕緣層。對于防火橋架,需檢查防火封堵是否嚴密,防火泥填充率需達95%以上,孔洞處需加裝防火包。

  The assembly of cable trays should follow the principle of "from bottom to top, from inside to outside". The tightening sequence of the connecting plate bolts should be symmetrically crossed to avoid insufficient sealing caused by unilateral force. Before installing the cover plate, it is necessary to clean the internal debris and use a vacuum cleaner in conjunction with a glue roller to prevent metal debris from damaging the cable insulation layer. For fireproof cable trays, it is necessary to check whether the fireproof sealing is tight, the fireproof mud filling rate should be above 95%, and fireproof bags should be installed at the holes.

  接地處理是保障系統的關鍵步驟。每段橋架需保證2處以上接地連接,跨接導線與橋架接觸面需去除鍍層,露出金屬本色后涂抹導電膏??偟入娢宦摻Y箱接地電阻不得大于1Ω,使用接地電阻測試儀分三次測量取平均值。對于強電與弱電共架場景,需采用分隔板隔離,間距保持300mm以上,防止電磁干擾。

  Grounding treatment is a crucial step in ensuring system safety. Each section of the bridge should ensure at least 2 grounding connections, and the contact surface between the jumper wire and the bridge should have its coating removed. After exposing the natural color of the metal, conductive paste should be applied. The grounding resistance of the total equipotential bonding box shall not exceed 1 Ω, and the grounding resistance tester shall be used to measure the average value in three separate measurements. For the scenario of strong and weak electricity sharing the same frame, a partition board should be used for isolation, with a spacing of at least 300mm to prevent electromagnetic interference.

  特殊環境安裝需采取專項措施。腐蝕性區域橋架需做三防處理,底漆干膜厚度≥50μm,面漆耐鹽霧性能需達720小時以上。高溫場所應選用耐溫150℃以上的硅橡膠密封條,橋架頂部需加裝隔熱板。振動設備附近需安裝彈性支架,固有頻率避開設備振動頻率50%以上,避免共振導致的疲勞損傷。

  Special measures need to be taken for installation in special environments. Corrosive area cable trays need to undergo three protection treatments, with a dry film thickness of ≥ 50 μ m for the primer and a salt spray resistance of at least 720 hours for the topcoat. Silicone rubber sealing strips with a temperature resistance of 150 ℃ or above should be used in high-temperature places, and insulation boards should be installed on the top of the bridge. Elastic supports should be installed near vibration equipment, with natural frequencies avoiding over 50% of the equipment's vibration frequency to prevent fatigue damage caused by resonance.

  驗收階段需進行多維度檢測。外觀檢查采用5倍放大鏡,查看焊縫、涂層缺陷。載荷試驗需加載設計值的150%,持續2小時無變形。接地連續性測試需在潮濕環境下進行,確保接觸電阻≤0.01Ω。提交的竣工資料需包含三維走向圖、材料合格證及第三方檢測報告,實現全生命周期可追溯。

  Multi dimensional testing is required during the acceptance stage. The appearance inspection adopts a 5x magnifying glass, focusing on inspecting weld seams and coating defects. The load test needs to be loaded to 150% of the design value for 2 hours without permanent deformation. The grounding continuity test should be conducted in a humid environment to ensure that the contact resistance is ≤ 0.01 Ω. The submitted completion documents must include a three-dimensional directional diagram, material qualification certificate, and third-party inspection report to achieve full lifecycle traceability.

  本文由濟南電纜橋架友情奉獻.更多有關的知識請點擊  http://www.h3022.cn   真誠的態度.為您提供為的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://www.h3022.cn Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.山東電纜橋架

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 西安标准厂房_陕西工业厂房_西咸新区独栋厂房_长信科技产业园官方网站 | 打造全球沸石生态圈 - 国投盛世 锂电混合机-新能源混合机-正极材料混料机-高镍,三元材料混料机-负极,包覆混合机-贝尔专业混合混料搅拌机械系统设备厂家 | 济宁工业提升门|济宁电动防火门|济宁快速堆积门-济宁市统一电动门有限公司 | 台湾阳明固态继电器-奥托尼克斯光电传感器-接近开关-温控器-光纤传感器-编码器一级代理商江苏用之宜电气 | 广州监控安装公司_远程监控_安防弱电工程_无线wifi覆盖_泉威安防科技 | 压滤机-洗沙泥浆处理-压泥机-山东创新华一环境工程有限公司 | 办公室家具公司_办公家具品牌厂家_森拉堡办公家具【官网】 | 食品质构分析仪-氧化诱导分析仪-瞬态法导热系数仪|热冰百科 | 顺辉瓷砖-大国品牌-中国顺辉| 焊接减速机箱体,减速机箱体加工-淄博博山泽坤机械厂 | 科箭WMS仓库管理软件-TMS物流管理系统-科箭SaaS云服务 | 粉末冶金注射成型厂家|MIM厂家|粉末冶金齿轮|MIM零件-深圳市新泰兴精密科技 | 北京乾茂兴业科技发展有限公司| 国标白水泥,高标号白水泥,白水泥厂家-淄博华雪建材有限公司 | LCD3D打印机|教育|桌面|光固化|FDM3D打印机|3D打印设备-广州造维科技有限公司 | 阳光模拟试验箱_高低温试验箱_高低温冲击试验箱_快速温变试验箱|东莞市赛思检测设备有限公司 | 水质监测站_水质在线分析仪_水质自动监测系统_多参数水质在线监测仪_水质传感器-山东万象环境科技有限公司 | 威客电竞(vk·game)·电子竞技赛事官网 | YT保温材料_YT无机保温砂浆_外墙保温材料_南阳银通节能建材高新技术开发有限公司 | 不锈钢螺丝 - 六角螺丝厂家 - 不锈钢紧固件 - 万千紧固件--紧固件一站式采购 | 西安中国国际旅行社(西安国旅) | 云南标线|昆明划线|道路标线|交通标线-就选云南云路施工公司-云南云路科技有限公司 | 体感VRAR全息沉浸式3D投影多媒体展厅展会游戏互动-万展互动 | 新车测评网_网罗汽车评测资讯_汽车评测门户报道 | 多功能干燥机,过滤洗涤干燥三合一设备-无锡市张华医药设备有限公司 | 首页-瓜尔胶系列-化工单体系列-油田压裂助剂-瓜尔胶厂家-山东广浦生物科技有限公司 | 悬浮拼装地板_幼儿园_篮球场_悬浮拼接地板-山东悬浮拼装地板厂家 | 北京公积金代办/租房发票/租房备案-北京金鼎源公积金提取服务中心 | 骨密度检测仪_骨密度分析仪_骨密度仪_动脉硬化检测仪专业生产厂家【品源医疗】 | 首页-恒温恒湿试验箱_恒温恒湿箱_高低温试验箱_高低温交变湿热试验箱_苏州正合 | 中高频感应加热设备|高频淬火设备|超音频感应加热电源|不锈钢管光亮退火机|真空管烤消设备 - 郑州蓝硕工业炉设备有限公司 | 卸料器-卸灰阀-卸料阀-瑞安市天蓝环保设备有限公司 | 原子吸收设备-国产分光光度计-光谱分光光度计-上海光谱仪器有限公司 | 耐力板-PC阳光板-PC板-PC耐力板 - 嘉兴赢创实业有限公司 | 交流伺服电机|直流伺服|伺服驱动器|伺服电机-深圳市华科星电气有限公司 | 理化生实验室设备,吊装实验室设备,顶装实验室设备,实验室成套设备厂家,校园功能室设备,智慧书法教室方案 - 东莞市惠森教学设备有限公司 | 网带通过式抛丸机,,网带式打砂机,吊钩式,抛丸机,中山抛丸机生产厂家,江门抛丸机,佛山吊钩式,东莞抛丸机,中山市泰达自动化设备有限公司 | 代理记账_免费注册公司_营业执照代办_资质代办-【乐财汇】 | 陕西安闸机-伸缩门-车牌识别-广告道闸——捷申达门业科技 | 铝合金重力铸造_铝合金翻砂铸造_铝铸件厂家-东莞市铝得旺五金制品有限公司 | 北京征地律师,征地拆迁律师,专业拆迁律师,北京拆迁律师,征地纠纷律师,征地诉讼律师,征地拆迁补偿,拆迁律师 - 北京凯诺律师事务所 |